CLARK COUNTY | June 26, 2026
Interstate 30 between mile markers 62 and 64 near Curtis is scheduled to have alternating eastbound inside and outside lane closures Monday, June 29, and a westbound outside lane closure Tuesday, June 30. The closures will last from 7 a.m. to 3 p.m. each day.
Weather permitting, the lane closures will allow crews to perform a routine inspection underneath the overpass.
Drivers are encouraged to:
- Use caution when traveling through the work area.
- Watch for crews and equipment entering or exiting the roadway.
- Obey all posted signs and speed limits.
- Allow additional travel time.
Digital message boards, cones, and signage will be in place to notify motorists of the closures.
Additional travel information can be found at IDriveArkansas.com or ARDOT.gov.
The post Lane Closures Scheduled for Routine Inspection on Interstate 30 Overpass appeared first on Arkansas Department of Transportation.